A complaint that the building or a required system is not being properly maintained.
Complaint73Oct 6, 2010Closed
A complaint that part of a building is falling or is in danger of falling.
Complaint10Mar 9, 2010Closed
A complaint that a sidewalk shed or supported scaffold is inadequate, defective, missing, or lacks a permit or certificate.
Complaint23Oct 2, 2009Closed
A complaint that part of a building is falling or is in danger of falling.
Complaint10Sep 29, 2009Closed
A complaint that part of a building is falling or is in danger of falling.
Complaint10Apr 28, 2009Closed
A complaint that the building is shaking or vibrating, or that its structural stability is affected.
Complaint30Apr 22, 2009Closed
A complaint that adjacent buildings are not being protected during construction.
Complaint03Mar 11, 2009Closed
A violation for failing to maintain the building's exterior walls or attached parts (its façade).
Violation104Nov 19, 2008Closed§ 28-302.1
A complaint that adjacent buildings are not being protected during construction.
Complaint03Nov 7, 2008Closed
A complaint that the building is shaking or vibrating, or that its structural stability is affected.
Complaint30Oct 30, 2008Closed
A complaint about unsafe, illegal, or mechanical demolition.
Complaint12Apr 26, 2007Closed
A complaint that adjacent buildings are not being protected during construction.
Complaint03Feb 7, 2007Closed
A complaint that the building is shaking or vibrating, or that its structural stability is affected.
Complaint30Dec 7, 2006Closed
A complaint that part of a building is falling or is in danger of falling.
Complaint10Apr 16, 2006Closed
A violation for failing to maintain the building's exterior wall (its façade).
ViolationB06Jun 16, 2003Closed§ 27-127
A ‘closed’ status means the city closed the case — it does not guarantee the issue was corrected.
Frequently asked questions
- How many structural / façade records does 309 WEST 39 STREET, MANHATTAN have on file?
- 15 structural / façade records are on file for 309 WEST 39 STREET, MANHATTAN from NYC Department of Buildings and HPD data.
- Where does this structural / façade data come from?
- Records come from the NYC Department of Buildings (DOB/ECB) and the Department of Housing Preservation and Development (HPD) via NYC Open Data, refreshed daily. Wocket translates the official codes into plain English.